In July of 2015, Argentina representatives for Belgrano freight railway project came to visit Weihai Ruihe Railway Sleeper Co.,Ltd, and appointed Ruihe as the sole manufacturer of this project.

With innate geographical advantages, high quality products, and first class service, Ruihe has shipped 650,000 pieces of sleepers to Argentina.


Figure 1. the Argentina engineers came to Ruihe for products inspection

Figure 1. the Argentina engineers came to Ruihe for products inspection.

Figure 2 Field inspection

Figure 2 Field inspection

Figure 3 Daily Inspection.

Figure 3 Daily Inspection.

Figure 4. loading into vessel

Figure 4. loading into vessel
Related Products
  • Turnout Sleeper For Concrete Tie Sleeper

    Turnout Sleeper For Concrete Tie Sleeper

    BBS-BÜ Concrete Tie Sleeper: Permissible axle loads (25t); Maxinum speed (>250km/h); concretegrade (C50/60); Weight (155kg); Length (2400-4800mm); Width (300mm); Height (200mm)
  • BBS-BÜ Concrete Tie Sleeper

    BBS-BÜ Concrete Tie Sleeper

    BBS-BÜ Concrete Tie Sleeper: Permissible axle loads (25t); Maxinum speed (>250km/h); concretegrade (C50/60); Weight (700kg); Length (2400mm); Width (590mm); Height (233mm)
  • BBS1 Concrete Tie Sleeper

    BBS1 Concrete Tie Sleeper

    BBS1 Concrete Tie Sleeper: Permissible axle loads (25t); Maxinum speed (>160km/h); concretegrade (C50/60); Weight (560kg); Length (2600mm); Width (570mm); Height (233mm)
  • Prestressed Mainline Sleeper - Argentina

    Prestressed Mainline Sleeper - Argentina

    This sleeper is specialized for Argentina Belgrano Freight Railway Renovation Project and track gauge is 1676 mm. And it is suitable for radius ≥350 m of curve track and direct track with type UIC54E1 steel rail.