Weihai Ruihe Railway Sleeper., Ltd.
En
Los Angeles Subway Renovation Project

Los Angeles Subway Renovation Project

In May of 2018, Ruihe plant started a business with SCJV from USA on the project of LA subway project. Ruihe is the only manufacturer to get the certificate of AC 157F-485 issued International Accreditation Service (IAS). Special concrete ties have been customized for this project that meet American industrial standard as well. This project is expected to be closed at the end of 2019.

Los Angeles Subway Renovation Project
Related Products
  • BBS1 Concrete Tie Sleeper

    BBS1 Concrete Tie Sleeper

    BBS1 Concrete Tie Sleeper: Permissible axle loads (25t); Maxinum speed (>160km/h); concretegrade (C50/60); Weight (560kg); Length (2600mm); Width (570mm); Height (233mm)
  • Ballasted Turnout Sleeper

    Ballasted Turnout Sleeper

    Ballasted turnout sleeper is mainly used for general routes and trans-regional welded rail track traffic, with a standard rail gauge of 1435 mm. It allows the maximum speed 120 Km/h, and applies to steel rails of 50 Kg/m or 60 Kg/m.
  • IIIQaD Bridge Sleeper

    IIIQaD Bridge Sleeper

    IIIQaD is applicable to a standard track gauge of 1435 mm that's used as bridge sleeper specialized for ballasted track, with radius ≥350 m of curve track and direct track. The steel rails of 60 Kg/m or 75 Kg/m can be used for this sleeper.
  • IIIa Prestressed Mainline Sleeper

    IIIa Prestressed Mainline Sleeper

    Generally, IIIa sleeper is suitable for the ballasted track with a standard rail gauge of 1435 mm. It's used for radius ≥300 m of curve track and direct track and applies to steel rails of 60 Kg/m or 75 Kg/m. The fastener matched is Type II elastic strip.