Weihai Ruihe Railway Sleeper., Ltd.
En
Los Angeles Subway Renovation Project

Los Angeles Subway Renovation Project

In May of 2018, Ruihe plant started a business with SCJV from USA on the project of LA subway project. Ruihe is the only manufacturer to get the certificate of AC 157F-485 issued International Accreditation Service (IAS). Special concrete ties have been customized for this project that meet American industrial standard as well. This project is expected to be closed at the end of 2019.

Los Angeles Subway Renovation Project
Related Products
  • Ballasted Turnout Sleeper

    Ballasted Turnout Sleeper

    Ballasted turnout sleeper is mainly used for general routes and trans-regional welded rail track traffic, with a standard rail gauge of 1435 mm. It allows the maximum speed 120 Km/h, and applies to steel rails of 50 Kg/m or 60 Kg/m.
  • BBS-BÜ Concrete Tie Sleeper

    BBS-BÜ Concrete Tie Sleeper

    BBS-BÜ Concrete Tie Sleeper: Permissible axle loads (25t); Maxinum speed (>250km/h); concretegrade (C50/60); Weight (700kg); Length (2400mm); Width (590mm); Height (233mm)
  • B93 Concrete Tie Sleeper

    B93 Concrete Tie Sleeper

    B93 Concrete Tie Sleeper: Permissible axle loads (25t); Maxinum speed (>250km/h); concretegrade (C50/60); Weight (348kg); Length (2600mm); Width (298mm); Height (193mm)
  • B320 Concrete Tie Sleeper

    B320 Concrete Tie Sleeper

    B320 Concrete Tie Sleeper: Permissible axle loads (25t); Maxinum speed (>250km/h); concretegrade (C50/60); Weight (360kg); Length (2600mm); Width (300mm); Height (273.5mm)